Bermar | Low Cross Court

Low Cross Court

Housing

Housing

Client: Wakefield and District Housing
Project Value: £675,000

Project Details

These works took place at Low Cross Court, mid-rise flats, to ensure that they are conforming to the regulations set out in the Security Fire Safety Pilot Scheme.

This meant we carried out fire stopping and fire protection remedial works.

The building is a 9-storey purpose-built block of residential flats, located in a residential area. The works consisted of the provision of fire safety and security equipment to Low Cross Court, including the following: a CCTV System, Door Entry System, Automatic Fire Detection System, Sprinkler System and Management Systems for all the above.

Related projects


Get in touch to talk about your next project

Get in touch

Bermar | Love Lane Residential

Love Lane Residential

Housing

Housing

Client: Witherslack Group
Project Value: £855,000

Project Details

The project was the complete construction of a two-storey residential building with strip foundations, beam and block ground floor, a hollow core first floor, brick and concrete block external walls with part cedar cladding and a steel framed single storey sunroom.

The team constructed and installed a timber truss pitched roof with tile coverings; UPVC windows; composite doors; internal partitions; internal doors; floor wall and ceiling finishes; mechanical and electrical installations; decorations; fitted kitchen; ancillary work including external services, drainage, car park, walls and landscape works.

Related projects


Get in touch to talk about your next project

Get in touch

Bermar | Ivy Bank Court

Ivy Bank Court, Baildon

Housing

Housing

Client: Ivy Bank Court
Project Value: £410,000

Project Details

The scope of works included the refurbishment of communal areas within Ivy Bank Court to ensure high quality, comfortable and safe living accommodation for elderly occupants is provided.

The general scope of works was to include a new fire alarm, new monitored detection to all flats, a new lighting scheme throughout, rewiring of the common areas, passive fire protection works including new fire rated flat entrance door sets, new cross corridor and stairwell doors, dry lining and skim to walls, new suspended ceilings and new carpet tiles.

Related projects


Get in touch to talk about your next project

Get in touch

Bermar Building | Belle Isle Tenant Management Organisation

BITMO

Public Sector

Housing

Client: Leeds City Council
Project Value:  £260,000

Project Details

The works consisted of taking down the upper part of the gable wall, isolating the existing wall ties and replacing them with new wall ties, structural works and the rebuilding of existing gable ends on various residential properties.

The wall tie system was remedied using Easyfix SS304 stainless steel ties driven into timber stud. The helical tie was driven in below the outer face of the external brickwork and sealed with epoxy grout and final colour matched mortar.

Staff liaised closely with the residents, as they continued to reside in their homes during the works.

Related projects


Get in touch to talk about your next project

Get in touch

Bermar Building | Pye Nest

Pye Nest, Halifax

Public Sector

Housing

Client: Anchor Hanover Housing

Project Details

Full external refurbishment.

Including the installation of external wall insulation, replacement windows and doors, and an enhancement to communal external areas and associated works.

A new access ramp was also installed. The works were completed in an occupied building, weekly resident meetings were held to keep everyone informed about the works and to answer any questions.