The completed project comprised of the construction of the new Centre for Creativity at Theatre Royal, Wakefield.
The building introduced a new entrance, a new public area and a bar. The main area could be split to form a smaller function room and a small performance area.
This extremely narrow and confined site in a city centre was built between the Theatre on one side and an occupied and live restaurant on the other and had stood derelict for many years.
The site had to be accessed from a narrow shared road to the rear. We had limited out-of-hours access to the front as this was the main road through the centre of Wakefield
The works included underpinning the building next door, groundworks, structural steel frame, curtain walling, roof and wall cladding, internal walls and doors, electrical & mechanical installation, floors and ceilings, drainage and external works.
The building was clad in Corten Cladding and had a metal deck and single-ply roofing. The groundworks were particularly complicated and involved several different levels, retaining walls and a large concrete fire escape ramp.
The main floor was a polished concrete floor that had to be protected throughout the scheme. We eventually connected the two buildings by breaking through into the theatre at several different levels.
Related projects
Skipton Town Hall
This historic building was constructed in 1862 and is Grade II listed. It is located in the centre…
Leeds Town Hall
The works consisted of replacing and upgrading Leeds Town Hall roof, as well as removing,…
Leeds Art Gallery and Library
The works involved a phased roof replacement programme together with safe access, rainwater goods…
Low Cross Court
These works took place at Low Cross Court, mid-rise flats, to ensure that they are conforming to…
Ivy Bank Court, Baildon
The scope of works included the refurbishment of communal areas within Ivy Bank Court to ensure…
BITMO
The works consisted of taking down the upper part of the gable wall, isolating the existing wall…
Thackray Museum of Medicine
The works Bermar undertook comprised internal structural, architectural, mechanical and electrical…
Kirkgate Market
Conservation works for Leeds City Council. The works comprised the internal and external…
Low Fold Family Centre
This project involved the alterations and refurbishment of existing internal and external teaching…
Cullingworth Community Centre
The works involved intensive groundwork, structural steel frame, blockwork, slate roof, natural…
Oakworth Crematorium
Proposed works include the Construction of a new Cremator, Entrance, Back House facilities and…