Client: Leeds City Council
Project Value: £260,000
Project Details
The works consisted of taking down the upper part of the gable wall, isolating the existing wall ties and replacing them with new wall ties, structural works and the rebuilding of existing gable ends on various residential properties.
The wall tie system was remedied using Easyfix SS304 stainless steel ties driven into timber stud. The helical tie was driven in below the outer face of the external brickwork and sealed with epoxy grout and final colour matched mortar.
Staff liaised closely with the residents, as they continued to reside in their homes during the works.
Related projects
Skipton Town Hall
This historic building was constructed in 1862 and is Grade II listed. It is located in the centre…
Leeds Town Hall
The works consisted of replacing and upgrading Leeds Town Hall roof, as well as removing,…
Leeds Art Gallery and Library
The works involved a phased roof replacement programme together with safe access, rainwater goods…
Low Cross Court
These works took place at Low Cross Court, mid-rise flats, to ensure that they are conforming to…
Ivy Bank Court, Baildon
The scope of works included the refurbishment of communal areas within Ivy Bank Court to ensure…
Thackray Museum of Medicine
The works Bermar undertook comprised internal structural, architectural, mechanical and electrical…
Kirkgate Market
Conservation works for Leeds City Council. The works comprised the internal and external…
Low Fold Family Centre
This project involved the alterations and refurbishment of existing internal and external teaching…
Cullingworth Community Centre
The works involved intensive groundwork, structural steel frame, blockwork, slate roof, natural…
Theatre Royal Wakefield
The completed project comprised of the construction of the new Centre For Creativity at Theatre…
Oakworth Crematorium
Proposed works include the Construction of a new Cremator, Entrance, Back House facilities and…